AMC COOLING TOWER

Monthly

  • Biological contamination visual check
  • Review water treatment report from client and advise
  • Belt tension check
  • Fan blades check
  • Sheaves and bushing corrosion check 
  • Check fan aerotip
  • Fan screens check
  • Remove any dirt or debris in fan screens, inlet louvers and fans
  • Fan cylinder and fan shaft check
  • Check fan pulley
  • Heat transfer fill media check ( VO)
  • Spray system visual Check
  • Check water distribution system and spray pattern & clean nozzles if required
  • Rubber grommets check
  • Distribution pipes check
  • Flexible connection check
  • Pipe straps & Support check
  • Drift eliminator clean
  • Vertical splash guard clean
  • Bleed off valve check
  • Mechanical float valve check
  • Clean basin structure & panel
  • Vibration switch (mechanical) – inspect enclosure for loose wiring and moisture
  • Overall unit visual inspection and report submission after every service

Half Yearly

  • Lubricate fan shaft bearings (every 1000 hours) of operation
  • Motor pulley hardware & alignment Check
  • Sliding motor base. – inspect and grease
  • Check & adjust torque seal disc
  • Check & adjust bearing flingers & bearing locking collar
  • Check & adjust fan shaft alignment
  • Check & clean bearing lubrication pipe line
  • Check & adjust fill supports.
  • Check drift eliminators & adjust orientation.

Annually

  •  Clean fills
  • Adjust vibration switch sensitivity
  • Electronic water level controller & solenoid valve – inspect & clean
  • Site Analysis and review report on overall energy generation and plant performance

Emergency Visits

  • 4 Emergency Visits included yearly FOC for electrical and mechanical assistance