AMC SOLAR HEATING

Commercial forced circulation systems

Monthly

  • Solar Collector Cleaning
  • Pressure Check
  •  Temperature Check
  •  Control cable Check
  •  Safety Valve Check
  • Gauges Check
  •  Pump Check
  •  Pipeline VO Check
  • Leakage check
  •  Tank Check
  • Controller check

Annually

  • Check and set of pumps and relativity of controller
  • lost loop fluid check and refilling
  • Controller check for parameter Metrix
  • Pipeline Check/Holiday test for leakage
  • Balancing the system Tank cleaning
  •  Calibration of safety valves and Gauges
  • Heat exchanger/PHE cleaning
  • Site Analysis and review report on overall energy generation and plant performance

Emergency Visits

  • 4 Emergency Visits included yearly FOC for electrical and mechanical assistance

Thermosiphon systems

Half yearly

  • Collector cleaning
  • Leakage check
  • Thermostat check
  • Heating element check

Annually 

  • Tank  internal cleaning
  • Closed loop filling if required
  • Calibration of safety valves

Emergency Visits

  • 2 Emergency Visits included yearly FOC for electrical and mechanical assistance